Our Work is Electrifying

Our company is built to handle any size project – commercial or residential. We ensure quality service in an efficient manner on every project completed by Hirsch Electric.

Station Ridge

Office Hanover, MD

General Contractor: Morgan Keller (7035 7037) & Whiting-Turner (7031)

Project Cost: $1,000,000 to $2,500,000 (MK) & $500,000 to $1,000,000 (WT)

The Station Ridge campus consists of three tilt-up office buildings totaling 264,000 square feet.  A fourth building is proposed but not yet constructed.  Hirsch Electric completed the first two buildings with Morgan Keller and the third building with Whiting-Turner.  Each building contains a 3,000 amp service with six tenant electrical closets.  The first floor lobbies were completely fitout; mechanicals and fire alarm system were installed throughout.  All the site lighting and ductbank work was performed by the Hirsch Utility division.  Hirsch was also awarded the Ciena fitout which included 74,000 square feet of building 7301 and the covered walkway between 7301 and 7035.