30 Light Street Garage

Garage Baltimore, MD

General Contractor: The Whiting-Turner Contracting Company

Project Cost: $1,000,000 to $2,500,000

The 30 Light Street Garage is a 10 story, 560 space, poured in place parking garage with street level retail space.  Most of the electrical rough-in was placed in the elevated concrete decks giving the electrical installation a very clean appearance.  Due to the retail space on the first floor, a full coverage voice fire alarm system was installed throughout the garage.  Hirsch Utility division extended a new primary ductbank to an existing manhole located right in the middle of the Lombard/Charles Street intersection.  A new electrical service and manhole were added to refeed the building to remain at the corner of Light and St. Paul streets.